Industry Pain Points
-
High Power Density
Data center servers and storage have high power density, requiring distribution systems to withstand heavy loads with excellent heat dissipation and power management.
-
Critical Power Continuity
24 hours operation demands zero outages and voltage fluctuations to avoid data loss or equipment damage.
-
Efficient Cooling Support
Equipment heat generation needs rational power allocation for balanced use between cooling systems and main devices.
-
PUE Optimization
Efficient distribution management is required to reduce transmission and conversion losses and lower PUE for cost and energy efficiency.
Daqo Solutions
Data center digital power systems fully upgrade traditional electrical equipment in mechanics, operation, arc suppression, seismic resistance, and energy efficiency, ensuring higher-performance primary equipment.
Adopting domestic high-performance embedded platforms and IEC 61850 for integrated power monitoring, plus a "cloud-pipe-edge-device" architecture, they enable intelligent O&M and support full-life-cycle management of electrical equipment.
*Click image to enlarge
Projects
-
China Mobile Fuzhou Data Center and Provincial Hub Building Project
Covering a total area of 185 mu with a total construction area of about 220,000 square meters, this data center houses 30,000 racks and can accommodate 240,000 servers, with an export bandwidth of over 10T. It is currently the largest data center in Fujian Province.
-
Zhenjiang Klockner-Moeller Electric Co.,Ltd.MODAN6000 Low-Voltage Switchgear380units
-
-
China Railway Main Data Center Phase II Project
China State Railway Group accelerates building a modern railway tech innovation system, upgrading railway informatization comprehensively. It empowers high-quality railway development with digital intelligence to facilitate travel.
As the operation hub for China Railway's business systems, its Main Data Center adopts virtualization, cloud computing, and big data. It deploys large-scale cloud platforms and proprietary hyper-converged all-in-ones, marking the railway industry's first overall cloud implementation.
-
Nanjing Daqo Electric Co.,Ltd.BLOCKSET Low-Voltage Switchgear630units
-
-
Agricultural Bank of China Inner Mongolia Data Center
The construction project of the Agricultural Bank of China Inner Mongolia Data Center is a major data center project launched by the Agricultural Bank of China to actively integrate into the national "Eastern Data Western Computing" project, adapt to the development trend of the digital economy, and better meet the needs of financial service businesses in the digital era. With a total investment of 8.8 billion yuan and a total construction area of 710,000 square meters, the project has a server installation capacity of 300,000 units.
-
Zhenjiang Siemens Busbar Trunking System Co.LTD.SIVACON S8 Low-Voltage Switchgear2263units
-
Zhenjiang Siemens Busbar Trunking System Co.LTD.XLC-Ⅲ Busbar Trunking12000Meters
-
The company consistently maintains robust innovative vitality, standing at the forefront of the industry and driving its advancement. Through cutting-edge technologies and products, it achieves goals of energy conservation, environmental protection, quality enhancement, and consumption reduction, continuously contributing to the development of a resource-efficient and environmentally friendly society.