Industry Pain Points
-
High Load & Power Demand
Rail transit requires high load capacity and fast response from distribution equipment due to heavy power loads.
-
Uninterrupted Power Supply
24-hours operation of subways, light rails, etc., demands highly reliable distribution equipment to avoid passenger delays or safety risks from outages.
-
Strict Environmental Adaptability
Distribution equipment must withstand complex conditions, underground humidity, extreme temperature changes, vibrations, that affect performance.
-
Complex Lines & Maintenance Difficulties
The large-scale system with equipment across stations and lines complicates maintenance, requiring rapid fault localization and handling.
Daqo Solutions
Rail transit digital power systems fully upgrade traditional electrical equipment and components in mechanics, operation, arcing suppression, earthquake resistance, and energy efficiency, ensuring higher-performance primary equipment meeting stricter standards.
Daqo's system uses domestic high-performance embedded platforms and IEC 61850 for advanced integrated power monitoring, with a "cloud-pipe-edge-device" architecture enabling intelligent O&M of power systems and supporting full-life-cycle equipment management.
*Click image to enlarge
Solution Value
-
Resource Allocation
Innovates power system management, optimizes resource allocation, reduces investment and ongoing O&M costs, and saves social resources.
-
Data Mining
Collected data supports reliable decisions for rail transit construction and operation, and provides valuable big data for municipal management and smart city development.
-
Low-Carbon Operation
Innovates power system management, optimizes resource allocation, reduces investment and ongoing O&M costs, and saves social resources.
Projects
-
Nanning Rail Transit Line 2
Nanning Rail Transit Line 2, the vertical line of Nanning's "cross-shaped" backbone network, serves as the north-south arterial route. With a total length of 27.5 km, it is fully underground and has 23 stations.
-
Zhenjiang Klockner-Moeller Electric Co.,Ltd.MODAN6000 Low-Voltage Switchgears1067units
-
-
Beijing Subway Line 13
Originally a loop (Xizhimen to Dongzhimen), now split into 13A (Chegongzhuang to Tiantongyuan East, 30.2km) and 13B (Malianwa to Dongzhimen, 32km). Connects northern Beijing to the city center, easing population flow and improving traffic and environment.
-
Zhenjiang Daqo Intelligent Electric Co.,Ltd.Daqo Intelligent UR4 High-Voltage Switchgear359units
-
Zhenjiang Klockner-Moeller Electric Co.,Ltd.MODAN6000 Low-Voltage Switchgears217units
-
-
Nanjing-Ma'anshan Intercity Railway
Nanjing Metro Line S2 is a cross-provincial commuter rail (Nanjing, Jiangsu to Ma'anshan, Anhui) with 65.59km of main line and 20 stations.
-
Nanjing, Jiangsu to Ma'anshan, Anhui
-
Jiangsu Daqo Changjiang Electric Co.,Ltd.DQC-40.5 Gas-Insulated Switchgear254units
-
Nanjing Daqo Electric Co.,Ltd.DQM Low-Voltage Switchgear469units
-
The company consistently maintains robust innovative vitality, standing at the forefront of the industry and driving its advancement. Through cutting-edge technologies and products, it achieves goals of energy conservation, environmental protection, quality enhancement, and consumption reduction, continuously contributing to the development of a resource-efficient and environmentally friendly society.